Other information:
Special Tool(s) /
General Equipment
Door Lift
Removal
NOTE:
Removal steps in this procedure may contain installation details.
NOTE:
LH side shown, RH side similar.
Open the door.
Remove the check arm bolt.
Torque:
18 lb.ft (25 Nm)
Disconnect the front door electrical connector.
..
Roof Opening Panel
The roof opening panel consists of the following:
Air deflector
Sliding glass panel
Sliding glass panel motor
Shield assembly
Shield motor
Roof opening panel fixed glass
Roof opening panel frame assembly
Roof opening panel drain hoses
Roof opening panel control switch
Roof opening panel seal
The
roof opening panel motor m..