Lincoln Nautilus Manuals

Lincoln Nautilus: Climate Control System - General Information / Reset the Outside Air Temperature Sensor Learned Values. General Procedures

Lincoln Nautilus 2018-2026 Service Manual / Electrical / Climate Control System / Climate Control System - General Information / Reset the Outside Air Temperature Sensor Learned Values. General Procedures

Configuration

  1. NOTE: The ambient air temperature sensor is a critical component for correct Air Conditioning (A/C) and Heating, Ventilation, and Air Conditioning (HVAC) system operation. Make sure after the reset is carried out the temperature is displaying correctly in the vehicle.

    NOTE: The outside air temperature sensor is also referred to as the ambient air temperature sensor in this manual.

    Using the diagnostic FDRS scan tool, follow the on screen prompts to run and reset the outside air temperature sensor learned values.

    Refrigerant System Tests - 2.0L EcoBoost (184kW/250PS) – MI4. General Procedures

    Inspection NOTE: Procedure 1 — Ambient Temperature below 21 °C (70 °F). NOTE: Proper A/C system diagnosis on a vehicle’s compressor is dependent on correct refrigerant system charge and tested in ambient temperatures above 21°C (70°F)...

    Air Conditioning (A/C) Compressor - 2.0L EcoBoost (184kW/250PS) – MI4. Removal and Installation

    Removal NOTICE: If installing a new A/C compressor due to an internal failure of the old unit, carry out the following procedures to remove contamination from the A/C system...

    Other information:

    Lincoln Nautilus 2018-2026 Service Manual: Electronic Parking Brake (EPB) Manual Release. General Procedures


    Activation NOTE: If the EPB cannot be released using the switch carry out the following procedure. If the battery is dead, jump start the battery to provide power and release the EPB using the switch. NOTE: Typical parking brake actuator motor shown...

    Lincoln Nautilus 2018-2026 Service Manual: Parking Aid - Component Location. Description and Operation


    Component Location, Parking Aid - Audible without 360 Degree View Camera Item Description 1 Front parking aid sensors 2 PAM 3 Parking aid switch 4 Rear side sensors 5 Rear parking aid sensors 6 Rear door speakers 7 Front door speakers 8 PSCM 9 Front active park assist sensors ..

    Categories

    Traction Control

    How Does Traction Control Work

    If your vehicle begins to slide, the system applies the brakes to individual wheels and, when needed, reduces power at the same time. If the wheels spin when accelerating on slippery or loose surfaces, the system reduces power in order to increase traction.

    Switching Traction Control On and Off

    WARNING: The stability and traction control light illuminates steadily if the system detects a failure. Make sure you did not manually disable the traction control system using the information display controls or the switch. If the stability control and traction control light is still illuminating steadily, have the system serviced by an authorized dealer immediately. Operating your vehicle with the traction co

    read more

    Copyright © 2026 www.linautilus.com