Lincoln Nautilus: Roof Opening Panel / Roof Opening Panel Alignment. General Procedures
Adjustment
NOTE:
Rear Fixed Glass Panel
NOTE:
If the rear fixed glass is in need of adjustment, align the
rear fixed glass panel and then align the front sliding glass panel.
The roof opening panel
initialization procedure must be done when repairs are carried out on
the roof opening panel system, including: any time either roof opening
panel motor, air deflector, roof opening panel glass (rear fixed or
front sliding) or the frame has been removed.
-
Measure the rear fixed glass panel to roof height at the
front sides of the glass and the rear of the glass referring to the
specifications shown.
-
If adjustment is necessary.
Fully open the shield.
-
NOTE:
RH side shown, LH side similar.
Reposition the roof opening panel seal as necessary.
-
NOTE:
RH side shown, LH side similar.
If necessary.
Adjust the rear fixed glass.
-
On both sides.
Loosen the 3 retaining bolts.
Torque:
49 lb.in (5.5 Nm)
-
Adjust the rear fixed glass to specifications from the previous steps.
Adjustment
NOTE:
Front Sliding Glass Panel
NOTE:
The roof opening panel initialization procedure must be done
when repairs are carried out on the roof opening panel system,
including: any time either roof opening panel motor, air deflector, roof
opening panel glass (rear fixed or front sliding) or the frame has been
removed.
-
Measure the front sliding glass panel to roof height at
the front of the glass and the front sliding glass panel to rear fixed
glass panel referring to the specifications shown.
-
If adjustment is necessary.
Fully open the shield.
-
NOTE:
RH side shown, LH side similar.
If necessary.
Reposition the roof opening panel seal as necessary.
-
NOTE:
RH side shown, LH side similar.
If necessary.
Adjust the front sliding glass panel.
-
On both sides.
Loosen the 3 retaining bolts.
Torque:
49 lb.in (5.5 Nm)
-
Adjust the front sliding glass panel to specifications from the previous steps.
-
If any adjustment was made on the front sliding or rear
fixed glass panels, initialize the front sliding glass panel.
Refer to: Power Roof Opening Panel Initialization (501-17 Roof Opening Panel, General Procedures).
Initialization
WARNING:
Keep objects and body parts clear of the glass panel when
carrying out the initialization procedure. During the initialization
procedure, the glass panel closes with high force and cannot detect
objects in its path...
Removal
NOTE:
Removal steps in this procedure may contain installation details.
Place the roof opening panel glass in the fully OPEN position...
Other information:
Master DTC Index
Module
Section
ABS module
REFER to: Anti-Lock Brake System (ABS) and Stability Control
(206-09 Anti-Lock Brake System (ABS) and Stability Control, Diagnosis
and Testing).
ACM
REFER to: Information and Entertainment System (415-00 Information
and Entertainment System - General Information..
Inspection
NOTE:
Do not use a caustic cleaning solution or a wire brush to clean the pistons or damage can occur.
Clean and inspect the (1) ring lands, (2) pin bosses,
(3) skirts and the (4) tops of the pistons. If wear marks, scores or
glazing is found on the piston skirt, check for a bent or twisted
connecting rod.
NOTE:
Make sure the oil ring hol..